At Lucideon, we have worked on many different and diverse projects across a wide range of materials and industries. Read here about some of the work we have done.
Testing provided evidence that the strength requirements of the UHPFRC were met at each stage of the flyover restoration process.
Analysis of concrete and screed identified that the flooring materials specified were not used and lower-cost alternatives were sourced
One of Mauer’s unique EWI systems achieved certification through the development of a customized testing program
Testing enabled Hemsec to attain ETA accreditation and CE certification for their SIPs
Testing and consultancy enabled third party insurance and building control sign-offs
Brickwork testing for the Battersea Power Station redevelopment project
Tests to determine the strength of walls constructed with bond beams
Testing of unique cladding system and its components
Benchmarking study carried out by Lucideon
Lucideon's assistance to Pretty's Solicitors