You are here: Home » Construction » Insight Hub » Case Studies
At Lucideon, we have worked on many different and diverse projects across a wide range of materials and industries. Read here about some of the work we have done.
Testing the original 1950s balustrades revealed that some of the balustrades were defective and needed to be replaced.
Testing provided evidence that the strength requirements of the UHPFRC were met at each stage of the flyover restoration process.
Analysis of concrete and screed identified that the flooring materials specified were not used and lower-cost alternatives were sourced
One of Mauer’s unique EWI systems achieved certification through the development of a customized testing program
Testing enabled Hemsec to attain ETA accreditation and CE certification for their SIPs
Testing confirmed that the parapet wall would support the expected loads of the Thames Path 'missing link'
Testing and consultancy enabled third party insurance and building control sign-offs
Brickwork testing for the Battersea Power Station redevelopment project
Tests to determine the strength of walls constructed with bond beams
Lucideon identified root cause of failure following a change of supplier
We developed a novel testing protocol to measure the rheology of setting varnishes
Scanning Electron Microscopy (SEM) helps identify source of contamination
Testing of unique cladding system and its components
Benchmarking study carried out by Lucideon
Sustainability review conducted by Lucideon
Tile LRV measurements
Lucideon's assistance to Pretty's Solicitors
Structural testing & consultancy
Natural stone masonry testing provided by Lucideon
Structural testing of a historic building
Slip characteristics measurement of in-situ flooring.
White Light Interferometry investigations of floor treatments.